Proposals & briefs · Sep 8, 2026 · 14 min read

Statement of work template with the rate card filled in.

A statement of work only pays for itself if a mid-project change can be priced straight off it. So the one printed below carries a rate card, filled in for a $27,400 video project, sitting next to the deliverables and the acceptance rule.

A statement of work is the document that turns a client's yes into terms: what you're making, what it costs, when it lands, what happens to the price when the work moves, and one named person whose written approval counts. The full version is printed further down this page with the figures already in place for a $27,400 ten-week video project, free to copy or take as a Word file or a PDF. Section 4 is the part most templates leave out altogether, because it's a rate card living inside the signed document, and a request nobody can price on the spot is a request you end up absorbing.

Most statement of work material is written for somebody who has a procurement department. Go looking and what you'll turn up is university research paperwork, government contracting forms, and enterprise templates drafted on the assumption that a legal team reviews everything before it leaves the building. Those documents all exist for good reasons, and none of those reasons is a twelve-person agency quoting a video series or a website rebuild for a client with eleven employees. That agency needs the exact wording that stops a fourth revision round being treated as free, so the numbers below are real and the uncomfortable paragraphs are printed in full rather than described.

What should a statement of work template include?

It has to do four things the proposal that won the work never had to do: say what finished looks like for each item, price the work sitting outside the fee, name the one person whose yes starts a change, and give both sides a date to count from. Rocketlane's guide sorts the material into nine components, DocuSign groups it differently again and adds a separate block for optional clauses, and the published lists simply don't agree with one another. Where they do agree is on the easy half: a purpose line, the work itself, the dates, the fee, ownership of what you make and a signature block. Write those carefully one time and they can sit untouched for years, since not one of them is what a project argues about in week six.

Five of the thirteen parts below are where the document earns its fee. Exclusions state the work you're not doing and what it would cost to add it. The rate card puts a number beside every addition anyone can reasonably imagine. Assumptions record the conditions you priced against, so a client who supplies product access three weeks late can see for themselves why the date moved. Acceptance defines finished, and gives the client a fixed window in which to object before something counts as done. Section 9 then hands approval to a single person, by name and email address, so nobody has to wonder later whose yes it was.

Writing the work itself is the part almost everyone does badly, and it's the easiest to fix. Compare "a set of onboarding videos and some motion graphics" against "five finished videos of ninety to one hundred and twenty seconds each, plus one motion kit containing an animated logo, two lower-third styles, three transitions and a title card". The first is an adjective in a suit. The second is something both of you can count in week nine, which is the only property that matters once somebody disagrees with you. If you want the longer argument for why a countable noun beats a description, we wrote it up in what makes a deliverable billable.

What does a filled-in statement of work look like?

What follows is the document in full, written out for the Pellworth project rather than left as empty brackets. Section 2 is the part you always replace, because it describes somebody else's video series instead of your work. What transfers is the machinery around it: the exclusions, the rate card, the acceptance rule, the named approver and the change-pricing paragraph all carry over almost word for word, with your own rates swapped in. Those rates are set for a project somewhere between twenty and thirty-five thousand dollars, which is a fair starting point if you've never put a price on an exclusion before.

The statement of work
STATEMENT OF WORK
Project: [project name]
Reference: [PELL-SOW-01]
Date: [date]

Client: Pellworth Instruments Co., [address]
Client contact: [name, title, email]
Supplier: [your agency name], [address]

1. PURPOSE
Pellworth Instruments Co. is engaging [your agency] to produce a five-part product onboarding video series and the motion brand kit it is built with. This statement of work covers the work, the fee, the dates, the rates for anything added later and the way changes are approved. It replaces any scope described in earlier proposals or emails.

2. WHAT WE'RE DELIVERING
2.1 Five finished onboarding videos, ninety to one hundred and twenty seconds each, covering [topic 1] through [topic 5], delivered as master files plus a web-compressed copy of each.
2.2 One motion brand kit: an animated logo, two lower-third styles, three transitions and a title card, delivered as editable project files.
2.3 Scripts for all five videos, developed from two discovery calls and the product documentation Pellworth provides.
2.4 English captions on all five videos, and delivery of each in three aspect ratios: 16:9, 1:1 and 9:16.
2.5 Two rounds of revisions on each video, and two on the motion brand kit.

3. WHAT'S NOT INCLUDED
3.1 On-camera filming isn't included. The series is built from screen capture, motion graphics and recorded voiceover.
3.2 Voiceover talent is booked and paid by Pellworth directly. We'll shortlist three voices at no charge.
3.3 Subtitle tracks in languages other than English aren't included, and are priced in section 4.
3.4 Publishing, hosting, player embedding and paid distribution aren't included.
3.5 Product changes that make a delivered video wrong aren't included. A re-edit is priced in section 4.

4. RATE CARD
These rates apply to anything added after signature, and they hold for ninety days from the date above.
4.1 Additional finished video, same length and format: $3,900 each.
4.2 Revision round beyond the two in 2.5: $650 per video.
4.3 Subtitle track in an additional language: $180 per video.
4.4 On-camera shoot day, one operator and equipment included: $2,400 per day.
4.5 Re-edit of a delivered video after a product change: $780 each.
4.6 Delivery inside five business days of approval: the rate above plus 25%.

5. WHAT WE'RE ASSUMING
5.1 Pellworth returns written feedback on each script and each cut within five business days.
5.2 Product access, brand assets and existing documentation arrive within ten business days of signature.
5.3 The five topics in 2.1 are fixed once the scripts are approved. Replacing a topic after that is a re-edit under 4.5.
5.4 If any of the above slips, the dates move by the length of the delay, and we'll tell you by how much before anything shifts.

6. DATES AND MILESTONES
Start: [date]. Final delivery: [date], being ten weeks from signature.
Milestone 1, all five scripts approved: end of week three.
Milestone 2, motion brand kit approved: end of week five.
Milestone 3, all five videos delivered: end of week ten.

7. WHEN SOMETHING IS ACCEPTED
Each item in section 2 is accepted when Pellworth confirms it in writing, or five business days after delivery if we've had no written feedback by then. Anything requested after an item is accepted is priced from section 4.

8. FEE AND PAYMENT
Total fee: $27,400 USD, fixed for the scope in section 2.
Discovery and scripts: $3,200.
Five finished videos at $3,900 each: $19,500.
Motion brand kit: $2,600.
Captions and delivery in three aspect ratios: $2,100.
Payment: $10,960 (40%) on signature, $8,220 (30%) on approval of the scripts, $8,220 (30%) on final delivery.
Invoices are payable within fourteen days. Work pauses on any invoice more than fourteen days overdue, and the dates move by the length of the pause.

9. WHO APPROVES CHANGES
[Name, title, email] approves changes and costs on behalf of Pellworth. [Name] approves on behalf of [your agency]. We only build, and only invoice, work the named approver has accepted in writing.

10. HOW CHANGES ARE PRICED
Either of us can propose a change to section 2 at any time. Where the request matches a line in section 4, we'll confirm that rate and the effect on the delivery date within one business day. Where it doesn't, we'll price it and reply within two business days with the cost, the hours behind it and the new date. Work on a change starts once the approver named in section 9 accepts it in writing, and nothing outside section 2 is built or invoiced without that written acceptance.

11. OWNERSHIP
Ownership of the delivered videos and the motion brand kit transfers to Pellworth on payment in full. Until then it stays with [your agency]. Our project files, presets and working methods stay ours, and any licensed music or stock footage stays under its own license.

12. ENDING EARLY
Either of us can end this engagement with fourteen days' written notice. Pellworth pays for work completed and in progress to that date, and we hand over everything scripted or edited so far.

13. THE WHOLE AGREEMENT
This document, once signed by both sides, is the agreement for the work described in section 2. Changes to it are made by the process in section 10 and not by email, call or message thread.

SIGNED
For Pellworth Instruments Co.: ____________________ Date: __________
For [your agency]: ____________________ Date: __________

Two features of it are easy to miss on a first read. The bulk of the word count sits in sections 3, 4, 7, 9 and 10, and that weighting is on purpose, since those are the ones you reread every time the project moves while the client reads them once and signs. The numbers on the clauses matter as much as the clauses themselves, because a reply saying "that's 4.3, so it's $180 a video" ends a discussion that a paragraph of explanation would have prolonged, and a client who can locate 4.3 in ten seconds usually stops pushing.

The version above wraps the work and the commercial terms into one signed document, which is how most agency projects under about $50,000 are handled. Strip out the fee, the ownership transfer and the exit clause and what's left is a different document entirely, which we've published separately as a project scope template filled in for a $32,000 build. Clients large enough to keep a legal team will usually want this one sitting underneath a master agreement instead, an arrangement we untangled in MSA vs SOW.

Why does the rate card belong inside the statement of work?

Because the alternative is quoting under pressure, on a call, opposite a client who has already settled on free as the right answer. Nearly every statement of work template has an exclusions section of some kind, and almost none of them attaches a number to what it excludes. That gap looks harmless while you're drafting and it decides the outcome of every conversation afterward, since "that isn't included" invites a negotiation about whether it should be, while "that's 4.1, three thousand nine hundred dollars, and it adds two weeks" is a quote the client can simply accept or decline.

There's a second effect that shows up over a whole year rather than in one conversation. When the rates are written down and signed, the awkward part of the exchange happened back at kickoff, when nobody was under any pressure and the client was in a good mood about the project. The week-six version is then arithmetic. When the rates aren't written down, you invent a number on the spot, usually low, because you're weighing it against the relationship rather than against your costs. We put figures on how much that habit costs across a year in what scope creep actually costs an agency, and the number is larger than most owners expect.

Priced exclusions also change how the section feels to read. A bare list of things you won't do comes across as defensive, and a client reading it that way starts wondering what else you're planning to refuse. A rate card reads as a menu instead, which quietly tells them that additions exist and cost money rather than being either free or forbidden, and that's the same case we made in in scope vs out of scope.

How does the template price a change in week six?

By turning the request into a quote you can send the same afternoon, using only lines that are already in the signed document. Say Pellworth launches a product line after kickoff, and in week six they ask for two more videos covering it, plus Spanish subtitles across the whole series so their Mexico team can use it. That's a real change, it's genuinely outside section 2, and it's exactly the moment an agency without a rate card either says yes for free or spends three days deciding what to charge.

With the rate card, the reply writes itself. Two additional videos at $3,900 each under 4.1 is $7,800. Spanish subtitles on all seven videos at $180 each under 4.3 is $1,260. The change is $9,060, which takes the project from $27,400 to $36,460, and since 4.6 wasn't invoked the delivery date moves out by two weeks to accommodate the extra production. Every one of those figures comes off a line the client already signed, which means the conversation is about whether they want the work, not about whether the price is fair.

The part that makes it stick is section 9 and section 10 working together. The quote goes to one named person, that person accepts in writing, and the accepted change becomes part of the scope. Nothing gets built before that, and nothing gets invoiced that wasn't accepted. If you want the reply itself rather than the principle, a change request form template gives you the fields to fill in, and handling scope creep without losing the client covers the tone to use when the request arrives as a favor rather than a request.

Is a statement of work the same as a scope of work?

No, though the two words get used interchangeably often enough that plenty of clients ask for one and mean the other. A scope of work describes the work: what gets made, what's excluded, what you assumed, and when it's finished. A statement of work is that description with the commercial terms wrapped around it, so it also carries the fee, the payment schedule, the ownership transfer and the terms for ending early. The document printed above is the second kind, and sections 2 through 7 of it would stand alone perfectly well as the first.

Which one you send depends mostly on what else exists. A client with a master agreement already signed wants a scope of work, because the commercial terms live upstairs. A new client with nothing in place wants the full statement of work, since it has to carry the whole relationship on its own. We compared the two documents line by line in scope of work vs statement of work, and if you want the underlying definition first, what a statement of work is walks through the four sections that decide money.

Consulting engagements sell hours and advice rather than files and builds, so their exclusions and acceptance rules work differently, and a consulting statement of work template covers that shape filled in for an $18,500 engagement.

Why a change gets absorbed when the rates live in your head

You know what an extra video costs. You've quoted it a hundred times, and if somebody woke you at three in the morning you'd say thirty-nine hundred dollars without hesitating. That knowledge is worth nothing at the moment it's needed, because the number in your head arrives in a conversation as an opinion, and the client is free to have a different one. The same number written as 4.1 in a document both of you signed nine weeks ago arrives as a fact, and the only question left is whether they want it.

So if you edit one thing in your current template this week, add the rate card. Six lines, taken from whatever you've absorbed for free on your last three projects, each with a price and a unit attached. It takes about twenty minutes and it's the section that turns a document describing a project into a document that can survive one.

The rest is making the change conversation easy enough that somebody actually has it, which is a different problem from having the rates written down. Docket takes each client request, prices it against what was agreed, gets a written yes from the named approver and keeps a permanent record of the whole exchange. Our pricing starts with a free plan for one project.

Frequently asked questions

What is a statement of work template?

It's a document you fill in and send after a client has said yes, so the terms of the job are written down before any billable work starts. It names the work, the exclusions, the fee and payment schedule, the dates, the approver and the rates for anything added later. The value of keeping it as a template is that the paragraphs protecting your margin get thought through once, in a calm hour, instead of being written from scratch on the evening a proposal is due.

What should a statement of work template include?

Thirteen parts in the version on this page: a purpose line, countable work items, written exclusions, a rate card, the assumptions you priced against, dates and milestones, an acceptance window, the fee with its payment schedule, a named approver, a paragraph saying how changes get priced, ownership on payment in full, an exit clause and signatures. The published component lists disagree about how many sections that should be, and the count matters far less than whether your exclusions carry prices and your rate card has real numbers in it.

Can you show a real example of a statement of work?

The whole document is printed on this page for a $27,400 ten-week video project, with the fee broken into its four lines, a six-line rate card, five written exclusions and a payment schedule that adds up. Most statement of work templates hand you an empty outline, or sit behind a signup form, so the figures here are filled in deliberately and are meant to be edited rather than copied blind.

Is a statement of work legally binding?

That depends on your jurisdiction and on what the document actually says, so a page on the internet can't answer it for your situation and nothing here substitutes for a lawyer reading your own template. In practice a statement of work signed by both sides often carries the whole agreement on a small project, while larger clients attach it underneath a master services agreement that holds the liability and confidentiality terms. Pay a lawyer once to read the version you plan to reuse, then reuse it for years.

Can I download the statement of work template as a Word file or a PDF?

Yes, and both files are generated from the same text printed on the page, so the download and the page can never drift apart. The buttons under the document give you an editable .docx and a PDF. Take the .docx, since you'll be rewriting section 2 for your own project and swapping your rates into section 4, and keep the PDF for reading or for showing a colleague the shape of the thing before you start.

Who signs the statement of work, and who approves changes after it?

Whoever controls the budget signs it, and section 9 should name that same person as the approver for anything added afterwards. The two roles come apart on larger accounts, where a project coordinator is your daily contact and a director holds the spending authority, and the failure mode is a $3,900 addition accepted in a chat window by somebody who was never able to commit the money. Naming one email address in the document settles it in advance, without anyone having to be awkward about it halfway through the project.